RC DEM is a residential complex under construction in Bishkek, in the village of Kok-Jar, at Arashan Street, 1. The project includes 2 buildings with 10 floors each. The nearest handover of buildings is expected in the 1st quarter of 2026. One-bedroom, two-bedroom, and three-bedroom apartments are a